- How long does a typical drywall repair take?
- Most single-room patch work — holes, seam cracks, nail pops — runs one to two visits: patch and texture on the first, a return to prime once the compound is genuinely dry. Full-room reboarding usually takes three to five days, and most of that is drying time between coats rather than hands-on work.
- What's the difference between a Level 4 and a Level 5 finish?
- Both describe how many coats of joint compound go on before paint. Level 4 is the standard for most walls under flat or eggshell paint. Level 5 adds a skim coat across the entire surface, and it's what you want under gloss, under a big window, or down a hallway where a light rakes along the wall — anywhere the surface gets read at a low angle instead of straight on.
- My home has plaster walls. Does all of it have to be replaced with drywall?
- Usually not. Plaster that's still keyed to its lath can be patched and skim-coated and will outlast a lot of newer board. Replacement makes sense where the lath has let go behind it, or where a remodel is opening the wall up anyway. That call gets made at the walkthrough, not over the phone.
- How soon after water damage can drywall be repaired?
- After the source is fixed and the cavity is actually dry, not just dry to the touch. Closing a wall up over damp framing traps the problem inside where nobody can see it. Drying time depends on how long the water sat and how far it traveled, which is part of what the walkthrough is for.
- What does the free estimate include?
- An in-person look at the job and a written, itemized number covering material, labor, and finish level. Not a range quoted over the phone from a description of the room.